When computing standard cost variances the difference between actual and standard price multiplied by actual quantity yields an?

View answers (3)

Show

Other questions on English

molinamaureen080693

28.10.2019 18:29

Why the presidential term should be limited to 3 years rather than 6 years? ​...

3 answer(s)

English

shannel99

28.10.2019 20:29

How is realistic in the story explain the taximan story...

1 answer(s)

English

HaHannah

28.10.2019 20:29

What is the reference of a how my brother leon brought home a wife?...

1 answer(s)

English

sicienth

28.10.2019 22:29

Give me sacrifices of our teachers​...

3 answer(s)

English

alexespinosa

28.10.2019 23:28

Who is the characteristic of the god must be crazy with their briefly description...

3 answer(s)

English

cleik

28.10.2019 23:28

Pursue work with talent and training?...

1 answer(s)

English

ALTERNATIVE QUESTIONS

kirbydimaranan

14.11.2019 15:23

Pananamit ng luzon, visayas, mindanao...

3 answer(s)

Filipino

maledabacuetes

14.11.2019 15:23

Paano pinamahalaan ng britanya ang rehiyon...

1 answer(s)

History

reyquicoy4321

14.11.2019 15:29

2types of festival in the philippines?...

1 answer(s)

Physical Education

ShairaGailSanchez

14.11.2019 16:28

Gawan ng talata"wilang katutubo tungo sa isang bansang filipino" salamat...

3 answer(s)

Filipino

girly61

14.11.2019 17:29

Find the equation of the line of the form y = mx + b that passes through the following pairs of points. 5. (-1, 10) and (0, 15)...

2 answer(s)

Math

cleik

14.11.2019 18:28

Who is dr santos and dr barcelona in philippine political caricature in alfred mc'coy during american era 1900-1941...

1 answer(s)

Araling Panlipunan

batopusong81

14.11.2019 19:29

Ano ibig sabihin ng pahayag ipaliwanag...

1 answer(s)

Araling Panlipunan

Jelanny

14.11.2019 20:28

What is the point in favor of the poem the seven ages of man​...

1 answer(s)

English

cyrilc310

15.11.2019 03:28

Find the 40th term of the following arithmetic sequence: 16, 6, –4, –14....

1 answer(s)

Math

rhaineandreirefuerzo

16.11.2019 08:28

Kailan at bakit sinulat ang alamat ng bundok pinto...

2 answer(s)

Filipino

another questions

What is a Cost Variance?

A cost variance is the difference between the cost actually incurred and the budgeted or planned amount of cost that should have been incurred. Cost variances are most commonly tracked for expense line items, but can also be tracked at the job or project level, as long as there is a budget or standard against which it can be calculated. These variances form a standard part of many management reporting systems. Some cost variances are formalized into standard calculations.

Nội dung chính

  • What is a Cost Variance?
  • Examples of Cost Variances
  • Direct Material Price Variance
  • Fixed Overhead Spending Variance
  • Labor Rate Variance
  • Purchase Price Variance
  • Variable Overhead Spending Variance
  • Favorable and Unfavorable Variances
  • Reporting of Cost Variances
  • Variance Analysis
  • Types of Variances
  • Variable Cost Variances
  • Direct Material Variances
  • Direct Labour Cost Variances
  • Variable Production Overhead Variances
  • Fixed Production Overhead Variances
  • Budget Variance
  • Volume Variance
  • Sales Variances
  • Sales Price Variance
  • Sales Volume Variance
  • Limitations of Variance Analysis
  • Dobromir Dikov
  • What is the difference between the actual price and the standard price multiplied by the actual quantity of materials purchased?
  • When there is a difference between the actual quantity and the standard quantity This is called a?
  • When calculating variances from standard costs the difference between actual and standard price multiplied by actual quantity gives a?
  • When computing standard cost variances the difference between actual and standard price multiplied by actual quantity yields a N?

Examples of Cost Variances

The following are examples of variances related to specific types of costs:

Direct Material Price Variance

The direct material price variance is the difference between the actual price paid to acquire a direct materials item and its budgeted price, multiplied by the actual number of units acquired. This information is needed to monitor the costs incurred to produce goods. The formula follows:

(Actual price - Budgeted price) x Actual quantity = Direct material price variance

Fixed Overhead Spending Variance

The fixed overhead spending variance is the difference between the actual fixed overhead expense incurred and the budgeted fixed overhead expense. To calculate the fixed overhead spending variance, subtract budgeted fixed overhead from actual fixed overhead. The formula for this variance is as follows:

Actual fixed overhead - Budgeted fixed overhead = Fixed overhead spending variance

Labor Rate Variance

The labor rate variance measures the difference between the actual and expected cost of labor. It is calculated as the difference between the actual labor rate paid and the standard rate, multiplied by the number of actual hours worked. The formula is:

(Actual rate - Standard rate) x Actual hours worked = Labor rate variance

Purchase Price Variance

The purchase price variance is the difference between the actual price paid to buy an item and its standard price, multiplied by the actual number of units purchased. The formula is:

(Actual price - Standard price) x Actual quantity = Purchase price variance

Variable Overhead Spending Variance

The variable overhead spending variance is the difference between the actual and budgeted rates of spending on variable overhead. The variance is used to focus attention on those overhead costs that vary from expectations. The formula is:

Actual hours worked x (Actual overhead rate - standard overhead rate)
= Variable overhead spending variance

Favorable and Unfavorable Variances

There is an unfavorable variance when the actual cost incurred is greater than the budgeted amount. There is a favorable variance when the actual cost incurred is lower than the budgeted amount. Whether a variance ends up being positive or negative is partially due to the care with which the original budget was assembled. If there is no reasonable foundation for a budgeted cost, then the resulting variance may be irrelevant from a management perspective.

Not all unfavorable variances are bad. Spending more money in one area may create a favorable variance somewhere else. For example, it might be necessary to spend twice as much on preventive maintenance to avoid a much greater total expense associated with replacing fixed assets more frequently. Thus, it is sometimes better to review cost variances from the level of an entire department, facility, or product line, rather than at a more detailed level. This higher level of analysis gives managers room in which to allocate funds in a manner designed to improve total profits.

Reporting of Cost Variances

Cost variances are usually tracked, investigated, and reported on by a cost accountant. This person determines the reason why a variance occurred and reports the results to management, possibly along with a recommendation for changing operations to reduce the size of the variance (if unfavorable) in the future.

It is not always useful to bury management with an analysis of every possible cost variance. Instead, the cost accountant should determine which variances are large enough to be worth their attention, or if there is some action to be taken to improve the situation. Thus, a cost variance report should only include a few items each month, preferably with recommended actions to be taken.

Today we will take a more detailed look at Variance Analysis. In this article, we will deal with the theory, and in next week’s article, we will build an Excel model to look more practically at the subject.

Variance Analysis

Variance analysis looks at the differences between planned and actual numbers. This method is used a lot in management accounting as a way to maintain control over the business. When we perform variance analysis, we compare the actual amount incurred/sold to either budgeted amount, planned amount, or standard amount.

Types of Variances

Variances can be two types based on their effect:

  • (F) Favorable Variance – when actual results are better than expected results;
  • (A) Adverse Variance – when actual results are worse than expected results.

A specific level of variance analysis allows the management to understand why discrepancies and fluctuations occur in the business and how to control them better. When calculating variances, we should always take the planned or budgeted amount and subtract the actual value. This way, we ensure that a positive number means a favorable variance, and a negative number – adverse variance.

The most common variances used in financial analysis are:

  • Variable cost variances
    • Direct Material variances
    • Direct Labour cost variances
    • Variable production overhead variances
  • Fixed production overhead variances
    • Budget Variance
    • Volume Variance
  • Sales Variances
    • Price Variance
    • Volume Variance

Variable Cost Variances

Direct Material Variances

The Total Direct Material Variance shows the difference between the standard and actual cost of materials for production activities. It consists of two variances:

Purchase Price Variance

The Purchase Price Variance, also known as Material Price Variance, calculates the difference between the actual price to buy an item and its expected standard price, multiplied by the actual number of units purchased. A positive variance means actual costs have increased, and vice versa.

Purchase Price Variance = (Actual Price – Standard Price) x Actual Quantity

Material Yield Variance

The Material Yield Variance, also known as Material Usage Variance, illustrates the difference between standard quantity expected to be used and the actual quantity of materials used, multiplied by the expected standard cost of materials. Unfavorable variance means that usage was higher than expected.

Material Yield Variance = (Actual Usage – Standard Usage) x Standard Cost Per Unit

Direct Labour Cost Variances

The Total Direct Labour Variance looks at the effect of the combination of labor rates and worked hours. The total variance can be broken down to the Direct Labour Price Variance and the Direct Labour Quantity Variance.

Direct Labour Price Variance

The Direct Labour Price Variance, also known as the Direct Labour Rate Variance, is calculated by taking the difference between the Standard Rate and the Actual Rate for labor cost, multiplied by the Actual Hours worked. It shows the effect on the labor costs by the change in the hourly labor rate, between the expected and the actual.

Direct Labour Price Variance = (Standard Rate – Actual Rate) x Actual Hours

Most common drivers for the variance can be:

  • pay premiums like bonuses or overtime;
  • incorrect pay rates laid down in the standard;
  • staffing issues – e.g., per standard we might plan one task for a lower pay rate employee;
  • production changes – increase in manual labor to decrease the quantity of used material or overhead absorption.

Direct Labour Quantity Variance

We calculate the Direct Labour Quantity Variance, also known as the Direct Labour Efficiency Variance, by taking the difference between the expected Standard Hours and Actual Hours worked, multiplied by the Standard Rate expected for hired labor.

Direct Labour Quantity Variance = (Standard Hours – Actual Hours) x Standard Rate

Some drivers for this variance can be:

  • employees may not be provided with the proper instructions to do their job;
  • employees did not receive the planned training;
  • we did not configure workstations adequately;
  • the mix of employees and competences is different than expected.

Variable Production Overhead Variances

We calculate the Total Variable Production Overhead Variance in two parts.

Variable Overhead Spending Variance

We calculate the Variable Overhead Spending Variance by subtracting the Actual Hours valued at the Standard Rate for the absorption of variable production costs from the Actual Costs incurred. Actual Rate is not used here, as we do not ‘purchase’ the variable overhead costs per direct labor hours.

Variable Overhead Spending Variance = Actual Costs – (Actual Hours x Standard Rate)

Some causes for this variance can be account misclassification, changed prices by suppliers, and outsourcing of various tasks.

Variable Overhead Efficiency Variance

We calculate the Variable Overhead Efficiency Variance by subtracting the Standard Hours value at the Standard Rate from the Actual Hours valued at the Standard Rate. The variance calculation assumes that variable overhead costs are genuinely driven by direct labor hours. It shows us the effect on costs from the change between the expected Standard Hours to the Actual Hours.

Variable Overhead Efficiency Variance = (Actual Hours x Standard Rate) – (Standard Hours x Standard Rate)

The calculation of the variance can be simplified as follows:

Variable Overhead Efficiency Variance = (Actual Hours – Standard Hours) x Standard Rate

Fixed Production Overhead Variances

There are two Fixed Production Overhead Variances. First, we have the Budget Variance, also known as the Fixed Overhead Expenditure Variance. Second, we have the Fixed Overhead Volume Variance. Based on the costing model, we can calculate both variances in the case of Absorption Costing. When applying Marginal Costing fixed production overheads are not absorbed in the cost of output, budgeted overheads and flexed overheads (fixed overheads absorbed) are the same. Therefore only the Budget Variance is calculated.

Budget Variance

The Budget Variance, also known as Fixed Overhead Expenditure Variance or Fixed Overhead Spending Variance, is calculated to illustrate the deviation from the budget in the fixed production costs. We derive it the same way under the Absorption and Marginal costing system.

Fixed Overhead Expenditure Variance = Actual Fixed Overheads – Budgeted Fixed Overheads

Drivers of this variance can be the seasonality in fixed costs or when manufacturing reaches a new step cost trigger point, where we will incur a whole further expense.

Volume Variance

The Fixed Overheads Volume Variance is the difference between budgeted and actual absorbed fixed production costs.

A seasonal business can cause it if the allocation base is the number of sold units. If the allocation base is labor hours, the cause can be optimizations of manual labor. Moreover, if the allocation base is machine hours, the variance can be caused by outsourcing some aspects of the production process.

We can further analyze the variance into two sub-variances.

Fixed Overhead Capacity Variance

The Fixed Overhead Capacity Variance calculates the variation in absorbed fixed production overheads attributable to changes in the manufacturing hours, as compared to the budget.

Fixed Overhead Capacity Variance = (Budgeted Production Hours – Actual Production Hours) x Fixed Overheads Absorption Rate

Fixed Overhead Efficiency Variance

The Fixed Overhead Efficiency Variance shows the variation attributable to the change in the manufacturing efficiency, i.e., manufacturing hours being more or less than what we expected.

Fixed Overhead Efficiency Variance = (Standard Production Hours – Actual Production Hours) x Fixed Overheads Absorption Rate

Sales Variances

The primary sales variance that can be calculated as Budgeted Sales less Actual Sales is the Sales Value Variance.

To further analyze it, we can break it down into two sub-variances.

Sales Price Variance

Sales Price Variance = (Actual price – Standard price) * Actual sold quantity

This variance shows us a comparison between the actual sales realized and the actual sales at standard prices.

Sales Volume Variance

The Sales Volume variance shows the deviation from budgeted sales to actual sales at actual prices. We calculate it as follows:

Sales Volume Variance = (Actual quantity sold – Budgeted quantity sold) * Budgeted price per unit

Calculated that way, the sales volume variance is unfavorable, or averse, when fewer items were sold than initially budgeted.

Some of the reasons for the volume variance can include:

  • competitors may release a similar newer product which is more attractive to the audience;
  • the company may release other products that compete with the product in question, cannibalizing its sales;
  • the company may change the selling price, which can influence the volume of sales.

We can further break down the Sales Volume variance into the Sales Mix variance and the Sales Quantity variance.

Sales Mix Variance

We use the sales mix variance to evaluate how much of the sales volume variance was due to a difference between actual and budgeted sales mix.

Sales mix variance = (Actual sales quantity – Actual sales volume at budgeted mix) * Standard price

It can also be calculated as Standard Sales – Revised Standard Sales.

The mix variance is favorable if the actual volume is higher than the actual volume at the budgeted (standard) mix, and vice versa.

Sales Quantity Variance

The quantity variance shows the effect of the unit volume that varies from the budget. It shows how much of the volume variance is due to the difference between the actual quantity sold at the budgeted mix and the planned quantity. We calculate it as follows:

Sales quantity variance = (Actual sales quantity at budgeted mix – Budgeted sales quantity) * Standard price

We can represent this as Revised Standard Sales – Budgeted Sales.

A favorable variance means that the actual volume at the budgeted sales mix is higher than the budgeted volume. If the actual volume at the budgeted mix is lower than the budgeted sales volume, the formula gives an adverse variance.

Limitations of Variance Analysis

We have to note that there are some problems with variance analysis that keep companies from overusing it. This type of analysis is mostly based on financial results that are sometimes released much later. In a fast-paced environment, management might need such information much faster and more regular than the usual once a month calculation after closing the financial accounts.

Variance calculations require more data than what is available in the accounting records, so the accounting staff usually has to go through other information such as bills of material, and overtime records to evaluate the causes of variances. The extra labor cost is only reasonable when management can correct problems based on the calculated deviations.

Also, loosely done or political budgeting is bound to deviate a lot from the actual results. Comparing to such unrealistic expectations may provide misleading signals and not be useful at all.

Conclusion

We do not need to analyze all variances. When we make our selection, we need to take into consideration the company’s profile, the nature of the industry, and the life cycle of the business. Also, it is essential to remember that not all unfavorable variances are bad, and vice versa. The management of a company faces a challenge to take variance information, evaluate the underlying reasons and causes, and take necessary corrective measures to optimize the business processes. However, one must be mindful, that variance analysis is essentially a comparison between standard (budgeted) values and actual results, and if the budget was unrealistic, then the resulting signals from the variance analysis might turn out to be very misleading.

Thank you for reading! Please tune in next week, when we will take a more practical look at variances by applying all this knowledge in building a variance analysis model in Excel.

Dobromir Dikov

FCCA, FMVA

Hi! I am a finance professional with 10+ years of experience in audit, controlling, reporting, financial analysis and modeling. I am excited to delve deep into specifics of various industries, where I can identify the best solutions for clients I work with.

In my spare time, I am into skiing, hiking and running. I am also active on Instagram and YouTube, where I try different ways to express my creative side.

The information and views set out in this publication are those of the author(s) and do not necessarily reflect the official opinion of Magnimetrics. Neither Magnimetrics nor any person acting on their behalf may be held responsible for the use which may be made of the information contained herein. The information in this article is for educational purposes only and should not be treated as professional advice. Magnimetrics and the author of this publication accept no responsibility for any damages or losses sustained in the result of using the information presented in the publication.

What is the difference between the actual price and the standard price multiplied by the actual quantity of materials purchased?

Hence material price variance is the difference between standard price and actual price multiplied by actual quantity.

When there is a difference between the actual quantity and the standard quantity This is called a?

2. Quantity variance. The quantity variance is the difference between the actual quantity of inputs used at the standard price and the standard quantity of inputs allowed for the actual output at the standard price.

When calculating variances from standard costs the difference between actual and standard price multiplied by actual quantity gives a?

23. The difference between the actual price and the standard price, multiplied by the actual quantity of materials purchased is the material price variance.

When computing standard cost variances the difference between actual and standard price multiplied by actual quantity yields a N?

When computing variances from standard costs, the difference between actual and standard price multiplied by actual quantity yields: Price variance.

When computing standard cost variances the difference between actual and standard price multiplied by actual quantity yields a?

When computing variances from standard costs, the difference between actual and standard price multiplied by actual quantity yields: Price variance.

When there is a difference between the actual quantity and the standard quantity This is called a?

A quantity variance is the difference between the actual usage of something and its expected usage. For example, if a standard quantity of 10 pounds of iron is needed to construct a widget, but 11 pounds are actually used, then there is a quantity variance of one pound of iron.

What variance is the difference between the actual price per unit and the standard price per unit?

The correct answer is direct materials price variance. If the company's actual price and standard price on direct materials are compared, the company is evaluating the price variance of the direct materials.

What is the difference between the standard cost of materials for the actual output and the actual cost of materials used for producing actual output?

The direct material variance is the difference between the standard cost of materials resulting from production activities and the actual costs incurred.